Author
Year
Title
File
M. Rieder, T. Schulze
2007
Nachweis der Integrität bestehender Pipelinesysteme im Zuge der Neuerteilung der Betriebsgenehmigung
3R International, Heft 1-2/2007, Seite 48-52
R. Pöttler, H. F. Schweiger, G. Peschl
2007
Geohazards – Cost Hazards A new method for evaluation of risks in underground structures
ECI Conference
K. Botschek, B. Kohl, R. Hörhan
2007
Austrian Risk Analysis for Road Tunnels – Development of a New Method for the Risk Assessment of Road Tunnels
International Conference
C. Neumann, F. Diernhofer, G. Harer, J. Koinig
2007
Koralm Tunnel – Development of Tunnel System Design and Safety Concept
International Conference
C. Neumann, C. Sommerlechner
2007
Wie passen Tunnelsicherheitsmaßnahmen zu den Rahmenbedingungen der Eisenbahn?
ÖGG - Fachseminar, Seite 1-6, 2007
M. Rieder, T. Schulze
2007
Verification of the integrity of existing pipeline systems
3R International, Special 1/2007, Seite 44-58
B. Kohl
2007
Risk Analyses for Road Tunnels – Light at the end of the tunnel?
Eurotransport, Heft 4, Seite 35-40, 2007
R. Pöttler, A. Spiegl
2007
Bestimmung des Einflusses von Karststrukturen auf die dauerhafte Stand- und Betriebssicherheit von Verkehrstunneln durch 3D-Finite-Element-Modellierung
Bautechnik, Heft 2, Seite 103-112, 2007
R. Pöttler, H. F. Schweiger, G. M. Peschl
2007
Application of the random set finite element method for analysing tunnel excavation
Georisk, Heft 1, Seite 43-56, 2007
W. Widmann
2006
Reuse of municipal wastewater using Tehran as an Example
Arab Water World, Heft 5, Seite 50-52, 2006
L. Bangert
2006
Engineering new limits for large gas transportation systems
3R International, Special 1/2007, Seite 44-58
R. Pöttler, H. F. Schweiger
2006
Anwendung der Random-Set-Methode (RSM) für Standsicherheitsuntersuchungen im Tunnelbau
Bautechnik, Heft 11, Seite 754-759, 2006
B. Kohl, K. Botschek, R. Hörhan
2006
Austrian Risk Analysis for Road Tunnels – Development of a new Method for the Risk Assessment of Road Tunnels
3rd International Conference
C. Neumann, C. Sommerlechner, R. Valo
2006
Emergency Exercises in Austrian Railway Tunnels
3rd International Conference
S. Eder, G. Poscher, C. Prager
2006
Risk Analyses and Risk Management – Slope Instabilities in Alpine Environments
ECI Conference on Geohazards (Lillehammer), paper 15, 2006
T. Callan
2006
Pipeline Integrity Management – The key to safe operation
The Australian Pipeliner, Heft 10, Seite 54-55, 2006
R. Pöttler, H. F. Schweiger
2006
Cost Evaluation for Traffic and Transport Infrastructure Projects Taking Account of Project Risks
ECI Conference on Geohazards (Lillehammer), paper 30, 2006
R. Pöttler, F. Starjakob, D. Spöndlin
2006
Strenger Tunnel: Tunnelbau in stark druckhaftem Gebirge / Strenger Tunnel: Tunnelling in highly squeezing Rock
Tunnel, Heft 5, Seite 58-65, 2006
K. Schmid
2006
The new bridge for the Hungerburg – Funicula-Railway – On the Way to the Top
International Conference of Bridges (Croatia), Seite 127-134, 2006