Designing the backbone of European hydrogen infrastructure
moreA large part of Northern Germany’s wind energy potential cannot currently be used due to bottlenecks in the power grid.
The aim is to be able to utilize this unused wind energy potential in the future by converting it into green hydrogen with the help of power-to-gas facilities.
Transporting gaseous hydrogen in pipelines has clear advantages – technically, economically and ecologically – in comparison to other transport options.
In this context, HyPerLink, Gasunie’s envisaged approximately 66-km-long hydrogen network, and a key part the future European hydrogen network, shall provide an efficient link between the Netherlands, Germany and Denmark. A particularity of this project is that the HyPerLink will be developed mainly by converting already existing natural gas infrastructure into hydrogen infrastructure with a capacity of up to 7.2 GW. ILF has been commissioned by Gasunie for the “Project design and project management for the modification of existing pipeline infrastructure in HyPerLink Phase I and Phase II”.
This gives ILF the opportunity to participate in one of the European hydrogen industry’s lighthouse projects.
The project for which an application for early commencement of measures has been submitted, is awaiting notification from the IPCEI program.