H. Wannenmacher, H. Krenn, N. Komma, M. Bauert, U. Grunicke
2012
Fallstudie Niagara Tunnel Facility Project: Technische und wirtschaftliche Aspekte passiv vorgespannter Druckstolle (A Case Study of the Niagara Tunnel Facility Project: Technical and economical aspects of passive prestressed pressure tunnels)
Swiss Tunnel Congress, Luzern, Seite 276 - 299, 13.06.2012
15th European Conference on Soil Mechanics and Geotechnical Engineering, Athen / Griechenland, 12. - 15. September 2011, Seite 1055 - 1060, Copyright 2011, with permission from IOS Press